The novelty has not died off, but times are getting busy. I have the barrel almost completely done, pretty close on the bolt, and planning to start the receivers today. Bolt, if you were able to zip those video files, you might be able to send them via e-mail through MSN. You can have 10MB attachments for free. If the segments were short enough, it would be possible. I know I would be interested. I need to get to work now, if I intend on getting anything done today.
Boltsniper,
I have just started my own FAR. I am very impressed with your plans. Just to clarify, even though you probably have already, the 1/2" PVC pipe is SCH 40 also, right? I know the 1" is 200 PSI and 1 1/4" is SCH 40 and want to check about the 1/2" pipe. Thanks alot for the idea and guide.