I think he meant that you should reinforce it with epoxy (in the grooves of the Plunger rod), as the plunger rod can snap with the ARs out.
I believe you are mistaken, epoxying the priming bar means building an epoxy channel around the priming bar that connects the pump grip to the bolt sled to prevent it from flexing under the load needed to prime a higher than 5kg spring.